IAC Assessment: OK0675
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0675
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2003
Principal Product Winches and Speed Reducer
NAICS 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 80,000
Annual Production 18,000 Pieces
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,273 1,584,300 kWh $0.05
Electricity Fees $1,425 - $ -
Natural Gas $8,952 1,150 MMBtu $7.78
TOTAL ENERGY COSTS $90,798
RECOMMENDED SAVINGS* $90,833 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,010
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $ $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$274
Cost:
$256
$168 5,265 $106 24 - - - - - - - - - - - - - - $168
5,265
kWh
$106
24
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
%
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$124
Cost:
$231
$124 3,890 - - - - - - - - - - - - - - - - $124
3,890
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
%
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$4,171
Cost:
$2,000
$4,171 130,342 - - - - - - - - - - - - - - - - $4,171
130,342
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
%
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,210
Cost:
$2,000
- - $2,210 315 - - - - - - - - - - - - - - -
-
kWh
$2,210
315
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$565
Cost:
$367
$473 14,788 $188 43 - - - - - - - - $(-96) - - - - - $473
14,788
kWh
$188
43
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$(-96)
-
$
-
-
$
-
-
%
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$428
Cost:
$2,730
- - - - $428 - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$428
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
%
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,672
Cost:
$2,173
- - - - - - $4,672 600 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,672
600
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
%
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,993
Cost:
-
- - - - - - $1,993 256 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,993
256
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
%
09: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$14,350
Cost:
$23,640
- - - - - - - - - - $5,856 12,460 - - $8,494 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$5,856
12,460
gal
-
-
$
$8,494
-
$
-
-
%
10: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$61,378
Cost:
$3,000
- - - - - - - - - - - - - - - - $61,378 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
$61,378
-
%
11: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$668
Cost:
$287
- - - - - - - - $668 400 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$668
400
Tgal
-
-
gal
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$90,833
Cost:
$36,684
$4,936 154,285 $2,504 382 $428 - $6,665 856 $668 400 $5,856 12,460 $(-96) - $8,494 - $61,378 - $4,936
154,285
kWh
$2,504
382
kW-months/year
$428
-
$
$6,665
856
MMBtu
$668
400
Tgal
$5,856
12,460
gal
$(-96)
-
$
$8,494
-
$
$61,378
-
%
TOTAL IMPLEMENTED Savings:
$5,010
Cost:
$2,623
$4,812 150,395 $294 67 - - - - - - - - $(-96) - - - - - $4,812
150,395
kWh
$294
67
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$(-96)
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $ $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Increase in Production