Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2004 |
Principal Product | Pressure Control Valves for Oil & Gas Field |
NAICS | 333132 - Oil and Gas Field Machinery and Equipment Manufacturing |
SIC | 3533 - Oil And Gas Field Machinery |
Sales | <$500,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 18,000 Pieces |
Production Hrs. Annual | 7,488 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $129,381 | 4,774,200 | kWh | $0.03 |
Electricity Demand | $87,172 | 11,515 | kW-months/year | $7.57 |
Electricity Fees | $61,948 | - | $ | - |
Natural Gas | $79,818 | 11,170 | MMBtu | $7.15 |
TOTAL ENERGY COSTS | $385,162 | |||
RECOMMENDED SAVINGS* | $61,405 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,783 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,075 Cost: $823 |
$3,531 | 130,280 | - | - | - | - | - | - | - | - | $(-456) | - | - | - |
$3,531 130,280 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
$(-456) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,817 Cost: $3,690 |
$1,817 | 67,033 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,817 67,033 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,836 Cost: $10,835 |
$6,292 | 232,170 | - | - | - | - | - | - | - | - | $(-456) | - | - | - |
$6,292 232,170 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
$(-456) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $13,162 Cost: $800 |
- | - | - | - | $13,162 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$13,162 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $22,602 Cost: $28,350 |
$14,765 | 544,836 | $24,478 | 2,996 | - | - | $(-16,641) | (-2,329) | - | - | - | - | - | - |
$14,765 544,836 kWh |
$24,478 2,996 kW-months/year |
- - $ |
$(-16,641) (-2,329) MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $5,188 Cost: $12,597 |
- | - | - | - | - | - | $5,188 | 726 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$5,188 726 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $3,347 Cost: $2,200 |
- | - | - | - | - | - | $3,347 | 468 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$3,347 468 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,847 Cost: $14,078 |
$325 | 11,980 | $157 | 19 | - | - | - | - | - | - | $1,934 | - | $431 | - |
$325 11,980 kWh |
$157 19 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
$1,934 - $ |
$431 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $546 Cost: $1,154 |
$135 | 4,993 | - | - | - | - | - | - | - | - | $346 | - | $65 | - |
$135 4,993 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
$346 - $ |
$65 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $2,985 Cost: - |
- | - | - | - | - | - | - | - | $2,985 | 12,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$2,985 12,000 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,405 Cost: $74,527 |
$26,865 | 991,292 | $24,635 | 3,015 | $13,162 | - | $(-8,106) | (-1,135) | $2,985 | 12,000 | $1,368 | - | $496 | - | $26,865 991,292 kWh |
$24,635 3,015 kW-months/year |
$13,162 - $ |
$(-8,106) (-1,135) MMBtu |
$2,985 12,000 lb |
$1,368 - $ |
$496 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,783 Cost: $19,502 |
$11,775 | 434,476 | - | - | $13,162 | - | $3,347 | 468 | - | - | $(-566) | - | $65 | - | $11,775 434,476 kWh |
- - kW-months/year |
$13,162 - $ |
$3,347 468 MMBtu |
- - lb |
$(-566) - $ |
$65 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |