IAC logo
IAC Assessment: OK0679
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0679
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2004
Principal Product Commercial and Residential Furniture
NAICS 337122 - Nonupholstered Wood Household Furniture Manufacturing
SIC 2511 - Wood Household Furniture
Sales $50,000,000-$100,000,000
# of Employees 182
Plant Area (Sq.Ft.) 172,000
Annual Production 60,000 Pieces
Production Hrs. Annual 2,080
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $246,081 10,276,800 kWh $0.02
Electricity Demand $193,251 44,693 kW-months/year $4.32
Electricity Fees $88,256 - $ -
Natural Gas $190,409 31,038 MMBtu $6.13
TOTAL ENERGY COSTS $737,691
RECOMMENDED SAVINGS* $99,936 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,412
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$18,651
Cost:
-
- - $18,651 1,223 - - - - - - - - -
-
kWh
$18,651
1,223
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
02: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$16,000
Cost:
-
- - - - - - - - - - $16,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$16,000
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,448
Cost:
$6,150
- - $13,448 4,806 - - - - - - - - -
-
kWh
$13,448
4,806
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,737
Cost:
$1,067
$1,114 24,875 $623 144 - - - - - - - - $1,114
24,875
kWh
$623
144
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$671
Cost:
$750
$671 14,976 - - - - - - - - - - $671
14,976
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,675
Cost:
$3,067
$1,077 24,041 $600 139 - - - - - - $(-2) - $1,077
24,041
kWh
$600
139
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$(-2)
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$32,645
Cost:
$2,000
- - - - $32,645 - - - - - - - -
-
kWh
-
-
kW-months/year
$32,645
-
$
-
-
MMBtu
-
-
lb
-
-
$
08: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT Savings:
$15,109
Cost:
$40,700
$(-1,441) (-32,160) - - - - $15,390 2,612 $1,160 580,444 - - $(-1,441)
(-32,160)
kWh
-
-
kW-months/year
-
-
$
$15,390
2,612
MMBtu
$1,160
580,444
lb
-
-
$
TOTAL RECOMMENDED Savings:
$99,936
Cost:
$53,734
$1,421 31,732 $33,322 6,312 $32,645 - $15,390 2,612 $1,160 580,444 $15,998 - $1,421
31,732
kWh
$33,322
6,312
kW-months/year
$32,645
-
$
$15,390
2,612
MMBtu
$1,160
580,444
lb
$15,998
-
$
TOTAL IMPLEMENTED Savings:
$3,412
Cost:
$4,134
$2,191 48,916 $1,223 283 - - - - - - $(-2) - $2,191
48,916
kWh
$1,223
283
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$(-2)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost