IAC logo
IAC Assessment: OK0687
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0687
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2004
Principal Product Portion Control Meats
NAICS 311611 - Animal (except Poultry) Slaughtering
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 12,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,811 1,662,410 kWh $0.09
Electricity Demand $40,865 4,654 kW-months/year $8.78
Electricity Fees $20,576 - $ -
Natural Gas $13,030 1,477 MMBtu $8.82
TOTAL ENERGY COSTS $216,282
RECOMMENDED SAVINGS* $18,345 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$7,853
Cost:
$8,000
- - $7,853 894 - - - - -
-
kWh
$7,853
894
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,548
Cost:
$825
$537 6,290 $76 9 $1,200 - $1,735 - $537
6,290
kWh
$76
9
kW-months/year
$1,200
-
$
$1,735
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,490
Cost:
$5,298
$1,490 17,468 - - - - - - $1,490
17,468
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,980
Cost:
$269
$1,980 23,213 - - - - - - $1,980
23,213
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,199
Cost:
$287
$790 9,266 $18 2 - - $391 - $790
9,266
kWh
$18
2
kW-months/year
-
-
$
$391
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,275
Cost:
$8,882
$2,482 29,097 $495 56 - - $(-702) - $2,482
29,097
kWh
$495
56
kW-months/year
-
-
$
$(-702)
-
$
TOTAL RECOMMENDED Savings:
$18,345
Cost:
$23,561
$7,279 85,334 $8,442 961 $1,200 - $1,424 - $7,279
85,334
kWh
$8,442
961
kW-months/year
$1,200
-
$
$1,424
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost