IAC logo
IAC Assessment: OK0696
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0696
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2004
Principal Product Custom Made Wood Furniture
NAICS 337215 - Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2541 - Wood Partitions And Fixtures
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 140,000
Annual Production 7,800 Pieces
Production Hrs. Annual 2,912
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,287 1,523,495 kWh $0.03
Electricity Demand $47,317 5,906 kW-months/year $8.01
Electricity Fees $21,337 - $ -
Natural Gas $51,966 5,552 MMBtu $9.36
TOTAL ENERGY COSTS $197,021
RECOMMENDED SAVINGS* $50,501 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,849
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$19,051
Cost:
$4,180
- - - - $19,051 2,100 - - - - - - -
-
kWh
-
-
kW-months/year
$19,051
2,100
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$19,260
Cost:
$5,950
- - - - $19,260 2,123 - - - - - - -
-
kWh
-
-
kW-months/year
$19,260
2,123
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,344
Cost:
$2,100
- - $6,344 680 - - - - - - - - -
-
kWh
$6,344
680
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,308
Cost:
$600
$280 10,337 $81 14 - - $600 - - - $347 - $280
10,337
kWh
$81
14
kW-months/year
-
-
MMBtu
$600
-
$
-
-
$
$347
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,876
Cost:
$559
$1,109 40,926 $959 166 - - $(-192) - - - - - $1,109
40,926
kWh
$959
166
kW-months/year
-
-
MMBtu
$(-192)
-
$
-
-
$
-
-
$
06: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,545
Cost:
-
- - - - - - - - $1,545 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,545
-
$
-
-
$
07: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$700
Cost:
-
- - - - - - $700 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$700
-
$
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$417
Cost:
$707
$417 15,375 - - - - - - - - - - $417
15,375
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$50,501
Cost:
$14,096
$1,806 66,638 $7,384 860 $38,311 4,223 $1,108 - $1,545 - $347 - $1,806
66,638
kWh
$7,384
860
kW-months/year
$38,311
4,223
MMBtu
$1,108
-
$
$1,545
-
$
$347
-
$
TOTAL IMPLEMENTED Savings:
$42,849
Cost:
$11,396
$1,526 56,301 $959 166 $38,311 4,223 $508 - $1,545 - - - $1,526
56,301
kWh
$959
166
kW-months/year
$38,311
4,223
MMBtu
$508
-
$
$1,545
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost