IAC Assessment: OK0702
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0702
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2005
Principal Product Industrial and Automotive Gasket
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 254
Plant Area (Sq.Ft.) 80,000
Annual Production 40,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $297,737 11,991,000 kWh $0.02
Electricity Demand $157,950 26,660 kW-months/year $5.92
Electricity Fees $151,959 - $ -
Natural Gas $1,790 164 MMBtu $10.91
TOTAL ENERGY COSTS $668,060
RECOMMENDED SAVINGS* $50,686 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $234
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS Savings:
$22,000
Cost:
$6,600
- - - - - - $22,000 201,600 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$22,000
201,600
lb
-
-
$
-
-
$
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$21,518
Cost:
$6,899
- - $21,518 3,632 - - - - - - - - -
-
kWh
$21,518
3,632
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,148
Cost:
$582
$546 22,022 $602 102 - - - - - - - - $546
22,022
kWh
$602
102
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$896
Cost:
$1,540
- - - - $896 85 - - - - - - -
-
kWh
-
-
kW-months/year
$896
85
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$234
Cost:
$530
$334 13,463 - - - - - - $(-100) - - - $334
13,463
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-100)
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$725
Cost:
$480
$202 8,273 $66 11 - - - - $180 - $277 - $202
8,273
kWh
$66
11
kW-months/year
-
-
MMBtu
-
-
lb
$180
-
$
$277
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,165
Cost:
$36,140
- - $4,165 703 - - - - - - - - -
-
kWh
$4,165
703
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$50,686
Cost:
$52,771
$1,082 43,758 $26,351 4,448 $896 85 $22,000 201,600 $80 - $277 - $1,082
43,758
kWh
$26,351
4,448
kW-months/year
$896
85
MMBtu
$22,000
201,600
lb
$80
-
$
$277
-
$
TOTAL IMPLEMENTED Savings:
$234
Cost:
$530
$334 13,463 - - - - - - $(-100) - - - $334
13,463
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-100)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost