IAC Assessment: OK0706
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0706
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2005
Principal Product Food preparation and distribution
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 100,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 7,072
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,865 2,629,104 kWh $0.04
Electricity Demand $41,332 5,435 kW-months/year $7.60
Electricity Fees $15,675 - $ -
Natural Gas $12,679 1,509 MMBtu $8.40
TOTAL ENERGY COSTS $181,975
RECOMMENDED SAVINGS* $37,370 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,251
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$10,579
Cost:
$1,500
- - $10,579 1,392 - - - - - - -
-
kWh
$10,579
1,392
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$6,672
Cost:
$13,451
$5,058 125,194 $1,614 212 - - - - - - $5,058
125,194
kWh
$1,614
212
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,084
Cost:
$1,468
- - - - $4,084 486 - - - - -
-
kWh
-
-
kW-months/year
$4,084
486
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,296
Cost:
$2,239
$3,964 98,112 $1,021 134 - - - - $7,311 - $3,964
98,112
kWh
$1,021
134
kW-months/year
-
-
MMBtu
-
-
$
$7,311
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,610
Cost:
$10,437
$626 15,495 $453 60 - - - - $531 - $626
15,495
kWh
$453
60
kW-months/year
-
-
MMBtu
-
-
$
$531
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,308
Cost:
$802
$1,308 32,388 - - - - - - - - $1,308
32,388
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$821
Cost:
$605
$103 2,540 $26 3 - - $188 - $504 - $103
2,540
kWh
$26
3
kW-months/year
-
-
MMBtu
$188
-
$
$504
-
$
TOTAL RECOMMENDED Savings:
$37,370
Cost:
$30,502
$11,059 273,729 $13,693 1,801 $4,084 486 $188 - $8,346 - $11,059
273,729
kWh
$13,693
1,801
kW-months/year
$4,084
486
MMBtu
$188
-
$
$8,346
-
$
TOTAL IMPLEMENTED Savings:
$17,251
Cost:
$14,951
$5,058 125,194 $12,193 1,604 - - - - - - $5,058
125,194
kWh
$12,193
1,604
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost