IAC logo
IAC Assessment: OK0709
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0709
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2005
Principal Product Solvent based coating
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 100,000
Annual Production 2,800 Thousand Gallons
Production Hrs. Annual 2,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,698 1,202,790 kWh $0.07
Electricity Demand $2,521 308 kW-months/year $8.19
Electricity Fees $16,283 - $ -
Natural Gas $145,603 21,542 MMBtu $6.76
TOTAL ENERGY COSTS $291,951
RECOMMENDED SAVINGS* $27,875 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,684
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$2,560
Cost:
-
$2,560 - - - - - - - $2,560
-
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,684
Cost:
$1,030
- - $3,684 545 - - - - -
-
kWh
$3,684
545
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,659
Cost:
$11,363
$1,943 23,603 - - $(-284) - - - $1,943
23,603
kWh
-
-
MMBtu
$(-284)
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,493
Cost:
$21,700
$11,493 139,651 - - - - - - $11,493
139,651
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,000
Cost:
-
- - - - $1,000 - - - -
-
kWh
-
-
MMBtu
$1,000
-
$
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,055
Cost:
$2,205
- - $4,055 600 - - - - -
-
kWh
$4,055
600
MMBtu
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,077
Cost:
$4,640
$1,077 13,092 - - - - - - $1,077
13,092
kWh
-
-
MMBtu
-
-
$
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$541
Cost:
$3,034
- - $541 80 - - - - -
-
kWh
$541
80
MMBtu
-
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$824
Cost:
$1,820
$824 10,009 - - - - - - $824
10,009
kWh
-
-
MMBtu
-
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$127
Cost:
$109
$124 1,508 - - - - $3 - $124
1,508
kWh
-
-
MMBtu
-
-
$
$3
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$159
Cost:
$1,000
$209 2,538 - - - - $(-50) - $209
2,538
kWh
-
-
MMBtu
-
-
$
$(-50)
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$696
Cost:
$4,181
$655 7,952 - - $41 - - - $655
7,952
kWh
-
-
MMBtu
$41
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$27,875
Cost:
$51,082
$18,885 198,353 $8,280 1,225 $757 - $(-47) - $18,885
198,353
kWh
$8,280
1,225
MMBtu
$757
-
$
$(-47)
-
$
TOTAL IMPLEMENTED Savings:
$3,684
Cost:
$1,030
- - $3,684 545 - - - - -
-
kWh
$3,684
545
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost