IAC Assessment: OK0710
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0710
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2005
Principal Product Batch Inclusion Bags & Pre-weight Chemicals
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2895 - Carbon Black
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 60,000
Annual Production 45,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,090 1,883,600 kWh $0.03
Electricity Demand $20,189 3,601 kW-months/year $5.61
Electricity Fees $31,851 - $ -
Natural Gas $16,269 1,503 MMBtu $10.82
TOTAL ENERGY COSTS $124,290
RECOMMENDED SAVINGS* $27,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,914
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4153 AVOID EMERGENCY REWIND OF MOTORS Savings:
$18,566
Cost:
$18,454
$18,566 635,820 - - - - - - - - $18,566
635,820
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,475
Cost:
$3,550
- - $2,475 441 - - - - - - -
-
kWh
$2,475
441
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,403
Cost:
$430
- - - - $1,403 148 - - - - -
-
kWh
-
-
kW-months/year
$1,403
148
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,823
Cost:
$1,607
$1,116 38,220 $707 126 - - - - - - $1,116
38,220
kWh
$707
126
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,439
Cost:
$4,746
$589 20,188 $525 96 - - - - $325 - $589
20,188
kWh
$525
96
kW-months/year
-
-
MMBtu
-
-
$
$325
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$467
Cost:
$356
$467 15,990 - - - - - - - - $467
15,990
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$729
Cost:
$30
$606 20,726 $123 24 - - - - - - $606
20,726
kWh
$123
24
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$298
Cost:
$895
$77 2,628 $20 4 - - $168 - $33 - $77
2,628
kWh
$20
4
kW-months/year
-
-
MMBtu
$168
-
$
$33
-
$
TOTAL RECOMMENDED Savings:
$27,200
Cost:
$30,068
$21,421 733,572 $3,850 691 $1,403 148 $168 - $358 - $21,421
733,572
kWh
$3,850
691
kW-months/year
$1,403
148
MMBtu
$168
-
$
$358
-
$
TOTAL IMPLEMENTED Savings:
$3,914
Cost:
$8,296
$589 20,188 $3,000 537 - - - - $325 - $589
20,188
kWh
$3,000
537
kW-months/year
-
-
MMBtu
-
-
$
$325
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost