IAC Assessment: OK0714
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0714
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2005
Principal Product Winches for Vehicles and Cranes
NAICS 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 210,000
Annual Production 1,600 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,108 6,043,800 kWh $0.04
Electricity Demand $110,165 18,299 kW-months/year $6.02
Electricity Fees $6,431 - $ -
Natural Gas $72,510 9,315 MMBtu $7.78
TOTAL ENERGY COSTS $428,214
RECOMMENDED SAVINGS* $151,759 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $79,678
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$1,866
Cost:
-
- - $1,866 - - - - - - - -
-
kWh
$1,866
-
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$56,721
Cost:
$117,780
$45,895 1,158,955 $13,417 2,232 - - - - $(-2,591) - $45,895
1,158,955
kWh
$13,417
2,232
kW-months/year
-
-
lb
-
-
$
$(-2,591)
-
$
03: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$4,058
Cost:
$920
$4,259 107,555 $87 14 - - $(-288) - - - $4,259
107,555
kWh
$87
14
kW-months/year
-
-
lb
$(-288)
-
$
-
-
$
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$8,299
Cost:
$70
$8,299 209,573 - - - - - - - - $8,299
209,573
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$10,600
Cost:
-
- - - - - - $10,600 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$10,600
-
$
-
-
$
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$70,215
Cost:
$3,931
- - $325 54 $570 570 $15,960 - $53,360 - -
-
kWh
$325
54
kW-months/year
$570
570
lb
$15,960
-
$
$53,360
-
$
TOTAL RECOMMENDED Savings:
$151,759
Cost:
$122,701
$58,453 1,476,083 $15,695 2,300 $570 570 $26,272 - $50,769 - $58,453
1,476,083
kWh
$15,695
2,300
kW-months/year
$570
570
lb
$26,272
-
$
$50,769
-
$
TOTAL IMPLEMENTED Savings:
$79,678
Cost:
$118,770
$58,453 1,476,083 $13,504 2,246 - - $10,312 - $(-2,591) - $58,453
1,476,083
kWh
$13,504
2,246
kW-months/year
-
-
lb
$10,312
-
$
$(-2,591)
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost