Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2005 |
Principal Product | Winches for Vehicles and Cranes |
NAICS | 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing |
SIC | 3531 - Construction Machinery |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 210,000 |
Annual Production | 1,600 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $239,108 | 6,043,800 | kWh | $0.04 |
Electricity Demand | $110,165 | 18,299 | kW-months/year | $6.02 |
Electricity Fees | $6,431 | - | $ | - |
Natural Gas | $72,510 | 9,315 | MMBtu | $7.78 |
TOTAL ENERGY COSTS | $428,214 | |||
RECOMMENDED SAVINGS* | $151,759 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $79,678 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $1,866 Cost: - |
- | - | $1,866 | - | - | - | - | - | - | - |
- - kWh |
$1,866 - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $56,721 Cost: $117,780 |
$45,895 | 1,158,955 | $13,417 | 2,232 | - | - | - | - | $(-2,591) | - |
$45,895 1,158,955 kWh |
$13,417 2,232 kW-months/year |
- - lb |
- - $ |
$(-2,591) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4227 USE COMPRESSOR AIR FILTERS |
Savings: $4,058 Cost: $920 |
$4,259 | 107,555 | $87 | 14 | - | - | $(-288) | - | - | - |
$4,259 107,555 kWh |
$87 14 kW-months/year |
- - lb |
$(-288) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $8,299 Cost: $70 |
$8,299 | 209,573 | - | - | - | - | - | - | - | - |
$8,299 209,573 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $10,600 Cost: - |
- | - | - | - | - | - | $10,600 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$10,600 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $70,215 Cost: $3,931 |
- | - | $325 | 54 | $570 | 570 | $15,960 | - | $53,360 | - |
- - kWh |
$325 54 kW-months/year |
$570 570 lb |
$15,960 - $ |
$53,360 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $151,759 Cost: $122,701 |
$58,453 | 1,476,083 | $15,695 | 2,300 | $570 | 570 | $26,272 | - | $50,769 | - | $58,453 1,476,083 kWh |
$15,695 2,300 kW-months/year |
$570 570 lb |
$26,272 - $ |
$50,769 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $79,678 Cost: $118,770 |
$58,453 | 1,476,083 | $13,504 | 2,246 | - | - | $10,312 | - | $(-2,591) | - | $58,453 1,476,083 kWh |
$13,504 2,246 kW-months/year |
- - lb |
$10,312 - $ |
$(-2,591) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |