IAC logo
IAC Assessment: OK0721
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0721
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2006
Principal Product Envelopes
NAICS 322230 - Stationery Product Manufacturing
SIC 2677 - Envelopes
Sales $50,000,000-$100,000,000
# of Employees 306
Plant Area (Sq.Ft.) 250,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 6,240
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $469,790 14,434,350 kWh $0.03
Electricity Demand $286,298 30,540 kW-months/year $9.37
Natural Gas $66,980 6,918 MMBtu $9.68
TOTAL ENERGY COSTS $823,068
RECOMMENDED SAVINGS* $26,061 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,909
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$486
Cost:
$415
$486 16,422 - - - - $486
16,422
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$17,540
Cost:
$7,400
$1,278 39,338 - - $16,262 1,680 $1,278
39,338
kWh
-
-
kW-months/year
$16,262
1,680
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,586
Cost:
$31,632
- - - - $5,586 577 -
-
kWh
-
-
kW-months/year
$5,586
577
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,837
Cost:
$13,148
$1,193 36,703 $644 86 - - $1,193
36,703
kWh
$644
86
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$289
Cost:
$1,373
$289 8,852 - - - - $289
8,852
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$323
Cost:
-
- - $323 43 - - -
-
kWh
$323
43
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,061
Cost:
$53,968
$3,246 101,315 $967 129 $21,848 2,257 $3,246
101,315
kWh
$967
129
kW-months/year
$21,848
2,257
MMBtu
TOTAL IMPLEMENTED Savings:
$7,909
Cost:
$45,195
$1,679 53,125 $644 86 $5,586 577 $1,679
53,125
kWh
$644
86
kW-months/year
$5,586
577
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas