Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2006 |
Principal Product | Aerospace components |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 126,000 |
Annual Production | 53,000,000 Pieces |
Production Hrs. Annual | 6,656 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $330,749 | 6,681,349 | kWh | $0.05 |
Electricity Demand | $209,433 | 26,371 | kW-months/year | $7.94 |
Natural Gas | $273,191 | 29,542 | MMBtu | $9.25 |
TOTAL ENERGY COSTS | $813,373 | |||
RECOMMENDED SAVINGS* | $73,954 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $43,855 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $25,049 Cost: $15,000 |
- | - | $25,049 | 2,848 | - | - |
- - kWh |
$25,049 2,848 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $33,532 Cost: $47,764 |
$33,532 | 670,634 | - | - | - | - |
$33,532 670,634 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,323 Cost: $5,175 |
$7,323 | 146,479 | - | - | - | - |
$7,323 146,479 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $219 Cost: $1,290 |
$219 | 4,387 | - | - | - | - |
$219 4,387 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,594 Cost: $1,150 |
$1,226 | 24,528 | $267 | 34 | $3,101 | - |
$1,226 24,528 kWh |
$267 34 kW-months/year |
$3,101 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $237 Cost: $1,013 |
$237 | 4,742 | - | - | - | - |
$237 4,742 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $3,000 Cost: $500 |
$3,000 | 60,000 | - | - | - | - |
$3,000 60,000 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $73,954 Cost: $71,892 |
$45,537 | 910,770 | $25,316 | 2,882 | $3,101 | - | $45,537 910,770 kWh |
$25,316 2,882 kW-months/year |
$3,101 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $43,855 Cost: $53,439 |
$43,855 | 877,113 | - | - | - | - | $43,855 877,113 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes |