IAC Assessment: OK0742
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0742
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2007
Principal Product vehicle floor liners
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3083 - Laminated Plastics Plate & Sheet
Sales $1,000,000-$5,000,000
# of Employees 100
Plant Area (Sq.Ft.) 160,000
Annual Production 500,000 Pieces
Production Hrs. Annual 6,240
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $275,180 4,744,800 kWh $0.06
Electricity Demand $40,019 14,478 kW-months/year $2.76
Electricity Fees $77,525 - $ -
Natural Gas $2,748 409 MMBtu $6.72
TOTAL ENERGY COSTS $395,472
RECOMMENDED SAVINGS* $43,336 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,180
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,095
Cost:
$79,680
$27,558 555,610 $2,537 919 - - $27,558
555,610
kWh
$2,537
919
kW-months/year
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,095
Cost:
$3,851
- - - - $2,095 749 -
-
kWh
-
-
kW-months/year
$2,095
749
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,664
Cost:
$275
- - $5,664 2,052 - - -
-
kWh
$5,664
2,052
kW-months/year
-
-
MMBtu
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,966
Cost:
$5,529
$1,361 27,440 $1,605 581 - - $1,361
27,440
kWh
$1,605
581
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,516
Cost:
$3,910
$2,516 43,376 - - - - $2,516
43,376
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$43,336
Cost:
$93,245
$31,435 626,426 $9,806 3,552 $2,095 749 $31,435
626,426
kWh
$9,806
3,552
kW-months/year
$2,095
749
MMBtu
TOTAL IMPLEMENTED Savings:
$8,180
Cost:
$4,185
$2,516 43,376 $5,664 2,052 - - $2,516
43,376
kWh
$5,664
2,052
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas