IAC Assessment: OK0775
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0775
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2009
Principal Product Powdered Metal Parts
NAICS 332117 - Powder Metallurgy Part Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 71
Plant Area (Sq.Ft.) 65,000
Annual Production 8,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $306,828 5,317,840 kWh $0.06
Electricity Demand $87,895 10,644 kW-months/year $8.26
Natural Gas $23,549 1,984 MMBtu $11.87
TOTAL ENERGY COSTS $418,272
RECOMMENDED SAVINGS* $77,815 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,248
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,182
Cost:
-
$4,182 72,600 - - - - $4,182
72,600
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,161
Cost:
$2,326
$2,161 37,515 - - - - $2,161
37,515
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,617
Cost:
$5,534
- - - - $6,617 558 -
-
kWh
-
-
kW-months/year
$6,617
558
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,208
Cost:
$11,677
$1,208 18,018 - - - - $1,208
18,018
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,179
Cost:
$9,264
$2,179 40,361 - - - - $2,179
40,361
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,586
Cost:
$4,119
$1,586 35,718 - - - - $1,586
35,718
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$5,419
Cost:
$386
$5,419 94,080 - - - - $5,419
94,080
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$30,940
Cost:
-
- - $30,940 3,250 - - -
-
kWh
$30,940
3,250
kW-months/year
-
-
MMBtu
09: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$19,665
Cost:
$140,000
$19,665 336,960 - - - - $19,665
336,960
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,858
Cost:
$2,925
- - - - $3,858 325 -
-
kWh
-
-
kW-months/year
$3,858
325
MMBtu
TOTAL RECOMMENDED Savings:
$77,815
Cost:
$176,231
$36,400 635,252 $30,940 3,250 $10,475 883 $36,400
635,252
kWh
$30,940
3,250
kW-months/year
$10,475
883
MMBtu
TOTAL IMPLEMENTED Savings:
$9,248
Cost:
$14,602
$5,390 90,618 - - $3,858 325 $5,390
90,618
kWh
-
-
kW-months/year
$3,858
325
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas