Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2010 |
Principal Product | Skid steers and compact loaders |
NAICS | 333120 - Construction Machinery Manufacturing |
SIC | 3531 - Construction Machinery |
Sales | >$500,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 10,000 Pieces |
Production Hrs. Annual | 4,680 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $681,667 | 13,039,371 | kWh | $0.05 |
Natural Gas | $841,915 | 91,994 | MMBtu | $9.15 |
TOTAL ENERGY COSTS | $1,540,024 | |||
RECOMMENDED SAVINGS* | $189,110 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $58,238 Cost: $1,003 |
- | - | $58,238 | 6,365 |
- - kWh |
$58,238 6,365 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $4,629 Cost: $21,300 |
- | - | $4,629 | 506 |
- - kWh |
$4,629 506 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,065 Cost: $9,879 |
$1,065 | 20,475 | - | - |
$1,065 20,475 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,109 Cost: $19,184 |
$2,109 | 40,567 | - | - |
$2,109 40,567 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $20,663 Cost: $226,451 |
$20,663 | 397,368 | - | - |
$20,663 397,368 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $31,971 Cost: $54,000 |
- | - | $31,971 | 3,496 |
- - kWh |
$31,971 3,496 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $23,972 Cost: $29,894 |
- | - | $23,972 | 2,705 |
- - kWh |
$23,972 2,705 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $12,490 Cost: $8,730 |
- | - | $12,490 | 1,365 |
- - kWh |
$12,490 1,365 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,489 Cost: $24,789 |
$6,489 | 124,791 | - | - |
$6,489 124,791 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $22,062 Cost: $351,000 |
- | - | $22,062 | 2,411 |
- - kWh |
$22,062 2,411 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,902 Cost: $1,801 |
- | - | $1,902 | 208 |
- - kWh |
$1,902 208 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $623 Cost: $1,230 |
- | - | $623 | 68 |
- - kWh |
$623 68 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,897 Cost: $435 |
$2,897 | 55,714 | - | - |
$2,897 55,714 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $189,110 Cost: $749,696 |
$33,223 | 638,915 | $155,887 | 17,124 | $33,223 638,915 kWh |
$155,887 17,124 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - - kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |