IAC Assessment: OK0799
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0799
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2010
Principal Product Skid steers and compact loaders
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales >$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 500,000
Annual Production 10,000 Pieces
Production Hrs. Annual 4,680
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $681,667 13,039,371 kWh $0.05
Natural Gas $841,915 91,994 MMBtu $9.15
TOTAL ENERGY COSTS $1,540,024
RECOMMENDED SAVINGS* $189,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$58,238
Cost:
$1,003
- - $58,238 6,365 -
-
kWh
$58,238
6,365
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,629
Cost:
$21,300
- - $4,629 506 -
-
kWh
$4,629
506
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,065
Cost:
$9,879
$1,065 20,475 - - $1,065
20,475
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,109
Cost:
$19,184
$2,109 40,567 - - $2,109
40,567
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,663
Cost:
$226,451
$20,663 397,368 - - $20,663
397,368
kWh
-
-
MMBtu
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$31,971
Cost:
$54,000
- - $31,971 3,496 -
-
kWh
$31,971
3,496
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$23,972
Cost:
$29,894
- - $23,972 2,705 -
-
kWh
$23,972
2,705
MMBtu
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$12,490
Cost:
$8,730
- - $12,490 1,365 -
-
kWh
$12,490
1,365
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,489
Cost:
$24,789
$6,489 124,791 - - $6,489
124,791
kWh
-
-
MMBtu
10: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$22,062
Cost:
$351,000
- - $22,062 2,411 -
-
kWh
$22,062
2,411
MMBtu
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,902
Cost:
$1,801
- - $1,902 208 -
-
kWh
$1,902
208
MMBtu
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$623
Cost:
$1,230
- - $623 68 -
-
kWh
$623
68
MMBtu
13: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,897
Cost:
$435
$2,897 55,714 - - $2,897
55,714
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$189,110
Cost:
$749,696
$33,223 638,915 $155,887 17,124 $33,223
638,915
kWh
$155,887
17,124
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas