IAC logo
IAC Assessment: OK0803
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0803
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2011
Principal Product Cattle feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 63,000
Annual Production 75,000 Tons
Production Hrs. Annual 5,070
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $232,780 2,935,600 kWh $0.08
Electricity Demand $29,655 13,180 kW-months/year $2.25
Natural Gas $17,409 3,087 MMBtu $5.64
TOTAL ENERGY COSTS $282,629
RECOMMENDED SAVINGS* $29,053 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,611
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$17,686
Cost:
$22,080
$17,686 198,719 - - $17,686
198,719
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,156
Cost:
$13,723
$2,156 24,224 - - $2,156
24,224
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$74
Cost:
$524
$74 832 - - $74
832
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,212
Cost:
$2,024
$1,212 13,916 - - $1,212
13,916
kWh
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$208
Cost:
$300
$208 2,335 - - $208
2,335
kWh
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,896
Cost:
$1,465
- - $2,896 513 -
-
kWh
$2,896
513
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,821
Cost:
$18,906
$4,821 54,169 - - $4,821
54,169
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$29,053
Cost:
$59,022
$26,157 294,195 $2,896 513 $26,157
294,195
kWh
$2,896
513
MMBtu
TOTAL IMPLEMENTED Savings:
$25,611
Cost:
$42,751
$22,715 255,223 $2,896 513 $22,715
255,223
kWh
$2,896
513
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas