IAC logo
IAC Assessment: OK0809
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0809
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2011
Principal Product Paint
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $100,000,000-$500,000,000
# of Employees 220
Plant Area (Sq.Ft.) 371,000
Annual Production 51,100 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,048,812 12,748,800 kWh $0.08
Electricity Demand $179,301 24,864 kW-months/year $7.21
Natural Gas $158,446 22,349 MMBtu $7.09
TOTAL ENERGY COSTS $1,386,559
RECOMMENDED SAVINGS* $156,459 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $99,955
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$32,884
Cost:
$59,335
$32,884 346,846 - - $32,884
346,846
kWh
-
-
MMBtu
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$13,809
Cost:
$46,235
$13,809 143,398 - - $13,809
143,398
kWh
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,138
Cost:
$2,588
$1,138 11,814 - - $1,138
11,814
kWh
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,472
Cost:
$1,238
$3,472 36,056 - - $3,472
36,056
kWh
-
-
MMBtu
05: 2.7122 DISCONNECT BALLASTS Savings:
$20,420
Cost:
$3,787
$20,420 212,044 - - $20,420
212,044
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,485
Cost:
$6,134
$1,485 15,416 - - $1,485
15,416
kWh
-
-
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,975
Cost:
$17,104
- - $14,975 2,112 -
-
kWh
$14,975
2,112
MMBtu
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$26,809
Cost:
$375
- - $26,809 3,781 -
-
kWh
$26,809
3,781
MMBtu
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,755
Cost:
$1,092
- - $3,755 530 -
-
kWh
$3,755
530
MMBtu
10: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$6,425
Cost:
$595
- - $6,425 906 -
-
kWh
$6,425
906
MMBtu
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$29,066
Cost:
$2,000
$29,066 335,365 - - $29,066
335,365
kWh
-
-
MMBtu
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,221
Cost:
$3,340
$2,221 23,067 - - $2,221
23,067
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$156,459
Cost:
$143,823
$104,495 1,124,005 $51,964 7,329 $104,495
1,124,005
kWh
$51,964
7,329
MMBtu
TOTAL IMPLEMENTED Savings:
$99,955
Cost:
$63,449
$69,390 754,092 $30,564 4,311 $69,390
754,092
kWh
$30,564
4,311
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas