IAC Assessment: OK0815
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0815
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2011
Principal Product Piston/Gear pump components
NAICS 333996 - Fluid Power Pump and Motor Manufacturing
SIC 3594 - Fluid Power Pumps And Motors
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 341,000
Annual Production 5,255,500 Pounds
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $772,809 10,228,800 kWh $0.08
Natural Gas $237,831 44,076 MMBtu $5.40
TOTAL ENERGY COSTS $1,010,640
RECOMMENDED SAVINGS* $109,512 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,563
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$57,281
Cost:
$13,000
$57,281 716,012 - - $57,281
716,012
kWh
-
-
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$12,351
Cost:
-
$12,351 154,390 - - $12,351
154,390
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,341
Cost:
$930
$7,341 91,760 - - $7,341
91,760
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$340
Cost:
$950
$340 4,256 - - $340
4,256
kWh
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,608
Cost:
$2,198
$2,608 32,597 - - $2,608
32,597
kWh
-
-
MMBtu
06: 2.7122 DISCONNECT BALLASTS Savings:
$849
Cost:
$696
$849 10,608 - - $849
10,608
kWh
-
-
MMBtu
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$15,876
Cost:
$3,096
- - $15,876 2,940 -
-
kWh
$15,876
2,940
MMBtu
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,335
Cost:
$20,544
- - $9,335 1,729 -
-
kWh
$9,335
1,729
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,531
Cost:
$633
- - $3,531 654 -
-
kWh
$3,531
654
MMBtu
TOTAL RECOMMENDED Savings:
$109,512
Cost:
$42,047
$80,770 1,009,623 $28,742 5,323 $80,770
1,009,623
kWh
$28,742
5,323
MMBtu
TOTAL IMPLEMENTED Savings:
$23,563
Cost:
$2,513
$20,032 250,406 $3,531 654 $20,032
250,406
kWh
$3,531
654
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas