IAC logo
IAC Assessment: OK0825
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0825
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2012
Principal Product Rubber Goods
NAICS 326291 - Rubber Product Manufacturing for Mechanical Use
SIC 3061 - Mechanical Rubber Goods
Sales $50,000,000-$100,000,000
# of Employees 470
Plant Area (Sq.Ft.) 326,000
Annual Production 3,820 Tons
Production Hrs. Annual 6,240
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,687,271 27,163,800 kWh $0.06
Electricity Demand $519,429 54,391 kW-months/year $9.55
Natural Gas $1,058,984 199,504 MMBtu $5.31
TOTAL ENERGY COSTS $3,265,684
RECOMMENDED SAVINGS* $365,841 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,138
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1224 REPLACE BOILER Savings:
$228,516
Cost:
$1,085,000
- - - - $228,516 43,035 -
-
kWh
-
-
kW-months/year
$228,516
43,035
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,541
Cost:
$68,775
$7,541 121,632 - - - - $7,541
121,632
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$194
Cost:
$3,150
$194 3,128 - - - - $194
3,128
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$19,699
Cost:
$65,000
$19,699 317,725 - - - - $19,699
317,725
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,478
Cost:
$1,500
$12,478 201,262 - - - - $12,478
201,262
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,119
Cost:
$538
$1,119 18,044 - - - - $1,119
18,044
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,300
Cost:
$450
$2,300 37,102 - - - - $2,300
37,102
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$62,755
Cost:
$31,500
$62,755 1,012,176 - - - - $62,755
1,012,176
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.7262 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS Savings:
$15,683
Cost:
$15,683
$15,683 252,945 - - - - $15,683
252,945
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.6232 INSTALL SET-BACK TIMERS Savings:
$929
Cost:
$937
- - - - $929 175 -
-
kWh
-
-
kW-months/year
$929
175
MMBtu
11: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$8,292
Cost:
$406,800
$327 5,248 - - $7,965 1,500 $327
5,248
kWh
-
-
kW-months/year
$7,965
1,500
MMBtu
12: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$6,335
Cost:
-
- - $6,335 663 - - -
-
kWh
$6,335
663
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$365,841
Cost:
$1,679,333
$122,096 1,969,262 $6,335 663 $237,410 44,710 $122,096
1,969,262
kWh
$6,335
663
kW-months/year
$237,410
44,710
MMBtu
TOTAL IMPLEMENTED Savings:
$21,138
Cost:
$70,813
$21,138 340,938 - - - - $21,138
340,938
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas