Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2012 |
Principal Product | Poultry |
NAICS | 311615 - Poultry Processing |
SIC | 2015 - Poultry Slaughtering And Processing |
Sales | $100,000,000-$500,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 70,000,000 Pounds |
Production Hrs. Annual | 4,940 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $550,984 | 13,568,500 | kWh | $0.04 |
Electricity Demand | $206,785 | 28,264 | kW-months/year | $7.32 |
Natural Gas | $142,540 | 27,848 | MMBtu | $5.12 |
TOTAL ENERGY COSTS | $900,309 | |||
RECOMMENDED SAVINGS* | $58,310 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,860 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $5,700 Cost: $5,000 |
- | - | - | - | $5,700 | 1,110 |
- - kWh |
- - kW-months/year |
$5,700 1,110 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,000 Cost: $2,000 |
$800 | 20,000 | $700 | 96 | $2,500 | 478 |
$800 20,000 kWh |
$700 96 kW-months/year |
$2,500 478 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,600 Cost: $2,500 |
$360 | 9,000 | $170 | 24 | $1,070 | 213 |
$360 9,000 kWh |
$170 24 kW-months/year |
$1,070 213 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,000 Cost: $500 |
$1,000 | 25,200 | - | - | - | - |
$1,000 25,200 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,800 Cost: $4,050 |
$1,800 | 45,400 | - | - | - | - |
$1,800 45,400 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,900 Cost: $14,000 |
$1,900 | 46,100 | - | - | - | - |
$1,900 46,100 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $10,150 Cost: $24,000 |
$7,588 | 189,700 | $2,562 | 350 | - | - |
$7,588 189,700 kWh |
$2,562 350 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION |
Savings: $31,700 Cost: - |
$22,000 | 543,000 | $9,700 | 1,320 | - | - |
$22,000 543,000 kWh |
$9,700 1,320 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $460 Cost: $3,400 |
$460 | 11,400 | - | - | - | - |
$460 11,400 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $58,310 Cost: $55,450 |
$35,908 | 889,800 | $13,132 | 1,790 | $9,270 | 1,801 | $35,908 889,800 kWh |
$13,132 1,790 kW-months/year |
$9,270 1,801 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,860 Cost: $8,900 |
$23,460 | 579,600 | $9,700 | 1,320 | $5,700 | 1,110 | $23,460 579,600 kWh |
$9,700 1,320 kW-months/year |
$5,700 1,110 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |