IAC logo
IAC Assessment: OK0836
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0836
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2012
Principal Product Hardwood Flooring
NAICS 321918 - Other Millwork (including Flooring)
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 135,000
Annual Production 1,500 Thousand Feet
Production Hrs. Annual 6,240
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,047,458 21,619,560 kWh $0.05
Electricity Demand $383,093 47,129 kW-months/year $8.13
Natural Gas $22,567 2,902 MMBtu $7.78
TOTAL ENERGY COSTS $1,453,118
RECOMMENDED SAVINGS* $320,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Wood Electricity Usage Electricity Demand Natural Gas Wood
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,500
Cost:
$1,700
$1,220 25,100 $280 34 - - - - $1,220
25,100
kWh
$280
34
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,200
Cost:
$27,500
$8,500 175,500 $2,700 336 - - - - $8,500
175,500
kWh
$2,700
336
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,400
Cost:
$10,000
$1,800 36,900 $600 72 - - - - $1,800
36,900
kWh
$600
72
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$28,900
Cost:
$15,100
$15,900 332,000 $13,000 1,600 - - - - $15,900
332,000
kWh
$13,000
1,600
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,000
Cost:
$500
- - - - - - $9,000 10,600 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,000
10,600
MMBtu
06: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$7,200
Cost:
$1,000
$(-9,800) (-202,000) $(-5,300) (-648) $22,300 2,900 - - $(-9,800)
(-202,000)
kWh
$(-5,300)
(-648)
kW-months/year
$22,300
2,900
MMBtu
-
-
MMBtu
07: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$248,000
Cost:
$675,000
$248,000 4,400,000 - - - - - - $248,000
4,400,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
08: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$12,700
Cost:
$13,000
$12,700 187,500 - - - - - - $12,700
187,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$320,900
Cost:
$743,800
$278,320 4,955,000 $11,280 1,394 $22,300 2,900 $9,000 10,600 $278,320
4,955,000
kWh
$11,280
1,394
kW-months/year
$22,300
2,900
MMBtu
$9,000
10,600
MMBtu
TOTAL IMPLEMENTED Savings:
$47,500
Cost:
$26,600
$7,900 166,900 $8,300 1,024 $22,300 2,900 $9,000 10,600 $7,900
166,900
kWh
$8,300
1,024
kW-months/year
$22,300
2,900
MMBtu
$9,000
10,600
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Wood Electricity Usage Electricity Demand Natural Gas Wood