IAC Assessment: OK0841
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0841
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2013
Principal Product Food service and packaging
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 245,000
Annual Production 28,000,000 Tons
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,320,497 17,560,591 kWh $0.08
Natural Gas $71,015 12,798 MMBtu $5.55
TOTAL ENERGY COSTS $1,391,512
RECOMMENDED SAVINGS* $268,828 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,106
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$44,134
Cost:
$43,500
$12,205 162,725 $31,929 5,753 $12,205
162,725
kWh
$31,929
5,753
MMBtu
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$68,923
Cost:
$4,000
$68,923 918,979 - - $68,923
918,979
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$15,201
Cost:
$4,500
- - $15,201 2,739 -
-
kWh
$15,201
2,739
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$693
Cost:
$4,051
$693 9,239 - - $693
9,239
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$151
Cost:
$228
$151 2,014 - - $151
2,014
kWh
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$40,107
Cost:
$74,800
$40,107 534,756 - - $40,107
534,756
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,217
Cost:
$4,000
$16,217 216,231 - - $16,217
216,231
kWh
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,111
Cost:
$1,134
$5,111 68,145 - - $5,111
68,145
kWh
-
-
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$33,063
Cost:
$21,269
$33,063 440,841 - - $33,063
440,841
kWh
-
-
MMBtu
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$36,370
Cost:
$33,509
$36,370 484,929 - - $36,370
484,929
kWh
-
-
MMBtu
11: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$3,860
Cost:
$5,760
$3,860 51,467 - - $3,860
51,467
kWh
-
-
MMBtu
12: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,913
Cost:
$1,520
$1,019 13,599 $894 161 $1,019
13,599
kWh
$894
161
MMBtu
13: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$3,085
Cost:
$14,817
$3,085 41,128 - - $3,085
41,128
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$268,828
Cost:
$213,088
$220,804 2,944,053 $48,024 8,653 $220,804
2,944,053
kWh
$48,024
8,653
MMBtu
TOTAL IMPLEMENTED Savings:
$25,106
Cost:
$24,002
$25,106 334,743 - - $25,106
334,743
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas