IAC Assessment: OK0844
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0844
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2013
Principal Product Pipe fittings
NAICS 332996 - Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498 - Fabricated Pipe And Fittings
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 261,000
Annual Production 1,400,000 Pieces
Production Hrs. Annual 4,480
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $246,880 6,060,000 kWh $0.04
Electricity Demand $134,994 20,795 kW-months/year $6.49
Electricity Fees $55,021 - $ -
Natural Gas $118,652 22,627 MMBtu $5.24
TOTAL ENERGY COSTS $555,547
RECOMMENDED SAVINGS* $34,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,375
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,922
Cost:
$21,000
$4,922 120,941 - - - - $4,922
120,941
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,000
Cost:
$32,130
- - $6,000 933 - - -
-
kWh
$6,000
933
kW-months/year
-
-
MMBtu
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$11,299
Cost:
$76,750
$9,942 235,550 - - $1,357 259 $9,942
235,550
kWh
-
-
kW-months/year
$1,357
259
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,154
Cost:
$4,200
$5,154 125,700 - - - - $5,154
125,700
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$6,800
Cost:
$18,500
$6,800 168,100 - - - - $6,800
168,100
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$34,175
Cost:
$152,580
$26,818 650,291 $6,000 933 $1,357 259 $26,818
650,291
kWh
$6,000
933
kW-months/year
$1,357
259
MMBtu
TOTAL IMPLEMENTED Savings:
$21,375
Cost:
$101,950
$20,018 482,191 - - $1,357 259 $20,018
482,191
kWh
-
-
kW-months/year
$1,357
259
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas