IAC logo
IAC Assessment: OK0859
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0859
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2013
Principal Product Fracturing pumps
NAICS 333911 - Pump and Pumping Equipment Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 80,000
Annual Production 3,000 Pieces
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $366,986 4,600,800 kWh $0.08
Electricity Demand $0 29,201 kW-months/year $0.00
Natural Gas $10,359 1,658 MMBtu $6.25
TOTAL ENERGY COSTS $377,345
RECOMMENDED SAVINGS* $78,271 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,479
#|Description Savings
Cost
Status Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $
01: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$12,404
Cost:
$65,000
- - - - $12,404 - -
-
kWh
-
-
MMBtu
$12,404
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,187
Cost:
$7,856
$1,187 14,878 - - - - $1,187
14,878
kWh
-
-
MMBtu
-
-
$
03: 2.7122 DISCONNECT BALLASTS Savings:
$342
Cost:
$900
$342 4,290 - - - - $342
4,290
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$232
Cost:
$975
$232 2,911 - - - - $232
2,911
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$327
Cost:
$2,550
$327 4,100 - - - - $327
4,100
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,550
Cost:
$3,000
$2,550 31,957 - - - - $2,550
31,957
kWh
-
-
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,135
Cost:
$3,356
- - $3,135 502 - - -
-
kWh
$3,135
502
MMBtu
-
-
$
08: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$20,774
Cost:
$7,707
$20,774 259,680 - - - - $20,774
259,680
kWh
-
-
MMBtu
-
-
$
09: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$11,338
Cost:
$4,600
$11,338 141,730 - - - - $11,338
141,730
kWh
-
-
MMBtu
-
-
$
10: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$17,170
Cost:
$30,000
$17,170 214,620 - - - - $17,170
214,620
kWh
-
-
MMBtu
-
-
$
11: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,753
Cost:
$460
$541 6,764 $1,212 194 - - $541
6,764
kWh
$1,212
194
MMBtu
-
-
$
12: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$3,487
Cost:
$3,063
$3,487 43,592 - - - - $3,487
43,592
kWh
-
-
MMBtu
-
-
$
13: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING Savings:
$3,200
Cost:
$6,500
$3,200 39,996 - - - - $3,200
39,996
kWh
-
-
MMBtu
-
-
$
14: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING Savings:
$372
Cost:
-
$372 4,647 - - - - $372
4,647
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$78,271
Cost:
$135,967
$61,520 769,165 $4,347 696 $12,404 - $61,520
769,165
kWh
$4,347
696
MMBtu
$12,404
-
$
TOTAL IMPLEMENTED Savings:
$24,479
Cost:
$47,356
$24,479 306,098 - - - - $24,479
306,098
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost