IAC Assessment: OK0864
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2013
Principal Product Fiber Glass, roofing material
NAICS 327993 - Mineral Wool Manufacturing
SIC 3172 - Personal Leather Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 70,000
Annual Production 34,000,000 Pounds
Production Hrs. Annual 8,712
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $489,587 13,252,800 kWh $0.04
Electricity Demand $216,737 25,852 kW-months/year $8.38
Natural Gas $990,710 243,514 MMBtu $4.07
TOTAL ENERGY COSTS $1,697,034
RECOMMENDED SAVINGS* $324,148 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $150,771
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$33,277
Cost:
$58,900
- - - - $33,277 - - - -
-
kWh
-
-
kW-months/year
$33,277
-
$
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$655
Cost:
$1,128
$499 13,514 $156 19 - - - - $499
13,514
kWh
$156
19
kW-months/year
-
-
$
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,872
Cost:
$1,478
- - - - - - $2,872 706 -
-
kWh
-
-
kW-months/year
-
-
$
$2,872
706
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,084
Cost:
-
$5,084 137,778 - - - - - - $5,084
137,778
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$8,999
Cost:
$27,500
$5,018 136,000 $3,981 475 - - - - $5,018
136,000
kWh
$3,981
475
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,158
Cost:
$10,250
$16,068 435,460 $4,089 488 - - - - $16,068
435,460
kWh
$4,089
488
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$46,176
Cost:
$10,642
$34,268 928,676 $11,908 1,421 - - - - $34,268
928,676
kWh
$11,908
1,421
kW-months/year
-
-
$
-
-
MMBtu
08: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$127,574
Cost:
$25,000
- - - - - - $127,574 31,345 -
-
kWh
-
-
kW-months/year
-
-
$
$127,574
31,345
MMBtu
09: 3.8126 USE FLUE GAS RECUPERATION TO REDUCE VOC Savings:
$79,353
Cost:
$32,100
- - - - - - $79,353 19,497 -
-
kWh
-
-
kW-months/year
-
-
$
$79,353
19,497
MMBtu
TOTAL RECOMMENDED Savings:
$324,148
Cost:
$166,998
$60,938 1,651,428 $20,134 2,403 $33,277 - $209,799 51,548 $60,938
1,651,428
kWh
$20,134
2,403
kW-months/year
$33,277
-
$
$209,799
51,548
MMBtu
TOTAL IMPLEMENTED Savings:
$150,771
Cost:
$52,992
$55,421 1,501,914 $15,997 1,909 - - $79,353 19,497 $55,421
1,501,914
kWh
$15,997
1,909
kW-months/year
-
-
$
$79,353
19,497
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas