IAC logo
IAC Assessment: OK0880
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0880
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2014
Principal Product Aerospace Parts Overhauling
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 52
Plant Area (Sq.Ft.) 223,000
Annual Production 22 Pieces
Production Hrs. Annual 2,210
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,071 2,517,600 kWh $0.05
Electricity Demand $87,865 9,276 kW-months/year $9.47
Natural Gas $47,089 8,433 MMBtu $5.58
TOTAL ENERGY COSTS $261,025
RECOMMENDED SAVINGS* $49,471 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,983
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$706
Cost:
$689
- - - - $706 127 -
-
kWh
-
-
kW-months/year
$706
127
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$302
Cost:
$463
$302 6,032 - - - - $302
6,032
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,983
Cost:
$61,440
$9,165 183,298 $6,818 720 - - $9,165
183,298
kWh
$6,818
720
kW-months/year
-
-
MMBtu
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$12,695
Cost:
$8,800
$12,695 253,900 - - - - $12,695
253,900
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$10,569
Cost:
$37,500
- - - - $10,569 1,894 -
-
kWh
-
-
kW-months/year
$10,569
1,894
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$227
Cost:
$798
$227 4,554 - - - - $227
4,554
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,087
Cost:
$3,573
$1,087 21,736 - - - - $1,087
21,736
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,439
Cost:
$6,993
- - - - $6,439 1,154 -
-
kWh
-
-
kW-months/year
$6,439
1,154
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,385
Cost:
$3,468
$1,385 27,697 - - - - $1,385
27,697
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$78
Cost:
$376
$29 587 - - $49 9 $29
587
kWh
-
-
kW-months/year
$49
9
MMBtu
TOTAL RECOMMENDED Savings:
$49,471
Cost:
$124,100
$24,890 497,804 $6,818 720 $17,763 3,183 $24,890
497,804
kWh
$6,818
720
kW-months/year
$17,763
3,183
MMBtu
TOTAL IMPLEMENTED Savings:
$15,983
Cost:
$61,440
$9,165 183,298 $6,818 720 - - $9,165
183,298
kWh
$6,818
720
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas