IAC logo
IAC Assessment: OK0887
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0887
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2014
Principal Product Aircraft Parts
NAICS 336411 - Aircraft Manufacturing
SIC 3721 - Aircraft
Sales $100,000,000-$500,000,000
# of Employees 115
Plant Area (Sq.Ft.) 77,860
Annual Production 28,000 Pieces
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $186,385 3,522,600 kWh $0.05
Electricity Demand $66,383 6,006 kW-months/year $11.05
Natural Gas $20,148 2,960 MMBtu $6.81
TOTAL ENERGY COSTS $272,916
RECOMMENDED SAVINGS* $73,604 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,604
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$36,397
Cost:
$35,374
$30,148 569,908 $6,249 565 - - $30,148
569,908
kWh
$6,249
565
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,219
Cost:
$3,969
$7,219 136,459 - - - - $7,219
136,459
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$8,717
Cost:
$3,613
$6,775 128,071 $1,942 175 - - $6,775
128,071
kWh
$1,942
175
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,814
Cost:
$8,926
$1,814 34,286 - - - - $1,814
34,286
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,474
Cost:
$11,975
$3,474 65,667 - - - - $3,474
65,667
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$13,990
Cost:
-
$6,036 114,097 - - $7,954 1,168 $6,036
114,097
kWh
-
-
kW-months/year
$7,954
1,168
MMBtu
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,993
Cost:
-
- - $1,993 180 - - -
-
kWh
$1,993
180
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$73,604
Cost:
$63,857
$55,466 1,048,488 $10,184 920 $7,954 1,168 $55,466
1,048,488
kWh
$10,184
920
kW-months/year
$7,954
1,168
MMBtu
TOTAL IMPLEMENTED Savings:
$73,604
Cost:
$63,857
$55,466 1,048,488 $10,184 920 $7,954 1,168 $55,466
1,048,488
kWh
$10,184
920
kW-months/year
$7,954
1,168
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas