IAC logo
IAC Assessment: OK0942
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0942
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2016
Principal Product Semiconductor Manufacturing
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 300,000
Annual Production 172,000 Pieces
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,303,209 63,358,800 kWh $0.05
Electricity Demand $716,393 98,868 kW-months/year $7.25
Natural Gas $261,238 78,524 MMBtu $3.33
TOTAL ENERGY COSTS $4,280,840
RECOMMENDED SAVINGS* $565,852 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,339
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,767
Cost:
$3,112
$3,767 72,445 - - - - $3,767
72,445
kWh
-
-
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,283
Cost:
$8,000
$17,283 332,369 - - - - $17,283
332,369
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$972
Cost:
$4,623
$815 15,673 $157 22 - - $815
15,673
kWh
$157
22
kW-months/year
-
-
$
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$73,902
Cost:
$31,000
$73,902 1,421,200 - - - - $73,902
1,421,200
kWh
-
-
kW-months/year
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$600
Cost:
$3,450
$500 9,617 $100 14 - - $500
9,617
kWh
$100
14
kW-months/year
-
-
$
06: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$469,328
Cost:
$2,302,430
- - - - $469,328 - -
-
kWh
-
-
kW-months/year
$469,328
-
$
TOTAL RECOMMENDED Savings:
$565,852
Cost:
$2,352,615
$96,267 1,851,304 $257 35 $469,328 - $96,267
1,851,304
kWh
$257
35
kW-months/year
$469,328
-
$
TOTAL IMPLEMENTED Savings:
$5,339
Cost:
$11,185
$5,082 97,735 $257 35 - - $5,082
97,735
kWh
$257
35
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes