IAC logo
IAC Assessment: OK0957
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0957
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2016
Principal Product Salt
NAICS 212399 - All Other Nonmetallic Mineral Mining
SIC 1479 - Chemical And Fertilizer Mining, Nec
Sales $10,000,000-$50,000,000
# of Employees 56
Plant Area (Sq.Ft.) 440,000
Annual Production 500,000 Units
Production Hrs. Annual 6,240
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $155,809 4,097,600 kWh $0.04
Electricity Demand $283,826 14,798 kW-months/year $19.18
Natural Gas $45,607 10,648 MMBtu $4.28
TOTAL ENERGY COSTS $485,242
RECOMMENDED SAVINGS* $43,854 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,767
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,200
Cost:
$2,994
$816 21,474 $384 20 $816
21,474
kWh
$384
20
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$890
Cost:
$1,320
$449 11,825 $441 23 $449
11,825
kWh
$441
23
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,710
Cost:
$2,100
$4,710 123,947 - - $4,710
123,947
kWh
-
-
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,025
Cost:
-
$2,025 53,290 - - $2,025
53,290
kWh
-
-
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,973
Cost:
$8,747
$6,973 183,505 - - $6,973
183,505
kWh
-
-
kW-months/year
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,059
Cost:
$52,806
$18,059 475,224 - - $18,059
475,224
kWh
-
-
kW-months/year
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,997
Cost:
$29,582
$2,172 57,149 $7,825 408 $2,172
57,149
kWh
$7,825
408
kW-months/year
TOTAL RECOMMENDED Savings:
$43,854
Cost:
$97,549
$35,204 926,414 $8,650 451 $35,204
926,414
kWh
$8,650
451
kW-months/year
TOTAL IMPLEMENTED Savings:
$31,767
Cost:
$63,653
$31,767 835,966 - - $31,767
835,966
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand