IAC logo
IAC Assessment: OK1016
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1016
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2019
Principal Product Ice cream and frozen dessert
NAICS 311520 - Ice Cream and Frozen Dessert Manufacturing
SIC 2024 - Ice Cream And Frozen Desserts
Sales $100,000,000-$500,000,000
# of Employees 249
Plant Area (Sq.Ft.) 141,803
Annual Production 12,400,000 Units
Production Hrs. Annual 6,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $615,484 14,080,500 kWh $0.04
Electricity Demand $261,772 33,010 kW-months/year $7.93
Electricity Fees $3,360 - $ -
Natural Gas $149,763 50,575 MMBtu $2.96
TOTAL ENERGY COSTS $1,054,152
RECOMMENDED SAVINGS* $46,227 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,843
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$27,210
Cost:
$730
$27,210 618,399 - - - - - - - - $27,210
618,399
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,028
Cost:
$28,358
$3,791 86,150 $1,237 156 - - - - - - $3,791
86,150
kWh
$1,237
156
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,766
Cost:
$9,480
$6,766 153,781 - - - - - - - - $6,766
153,781
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,330
Cost:
-
$4,330 98,410 - - - - - - - - $4,330
98,410
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,523
Cost:
-
- - $1,523 192 - - - - - - -
-
kWh
$1,523
192
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
06: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$885
Cost:
$4,860
- - - - $734 248 $89 1,589 $62 2 -
-
kWh
-
-
kW-months/year
$734
248
MMBtu
$89
1,589
Tgal
$62
2
Tgal
07: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$485
Cost:
$636
$485 11,025 - - - - - - - - $485
11,025
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$46,227
Cost:
$44,064
$42,582 967,765 $2,760 348 $734 248 $89 1,589 $62 2 $42,582
967,765
kWh
$2,760
348
kW-months/year
$734
248
MMBtu
$89
1,589
Tgal
$62
2
Tgal
TOTAL IMPLEMENTED Savings:
$9,843
Cost:
$28,994
$8,606 195,585 $1,237 156 - - - - - - $8,606
195,585
kWh
$1,237
156
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal