IAC logo
IAC Assessment: OK1109
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1109
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2024
Principal Product Rebuilt jet engines
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $1,000,000-$5,000,000
# of Employees 160
Plant Area (Sq.Ft.) 271,962
Annual Production 100 Units
Production Hrs. Annual 5,824
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $218,807 2,485,837 kWh $0.09
Electricity Demand $72,936 9,368 kW-months/year $7.79
Natural Gas $35,113 7,013 MMBtu $5.01
TOTAL ENERGY COSTS $332,569
RECOMMENDED SAVINGS* $117,633 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,576
Cost:
$44,000
$10,021 113,869 $2,555 328 - - $10,021
113,869
kWh
$2,555
328
kW-months/year
-
-
MMBtu
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$58,213
Cost:
$394,200
$58,213 661,510 - - - - $58,213
661,510
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,162
Cost:
$3,598
$8,162 92,750 - - - - $8,162
92,750
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$213
Cost:
$820
$213 2,418 - - - - $213
2,418
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$5,582
Cost:
$11,028
$5,582 63,434 - - - - $5,582
63,434
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$5,867
Cost:
$38,775
$5,867 66,674 - - - - $5,867
66,674
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$8,413
Cost:
$3,850
- - $8,413 1,080 - - -
-
kWh
$8,413
1,080
kW-months/year
-
-
MMBtu
08: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$18,482
Cost:
$120,578
$13,562 154,115 - - $4,920 982 $13,562
154,115
kWh
-
-
kW-months/year
$4,920
982
MMBtu
09: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$125
Cost:
$825
$125 1,419 - - - - $125
1,419
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$117,633
Cost:
$617,674
$101,745 1,156,189 $10,968 1,408 $4,920 982 $101,745
1,156,189
kWh
$10,968
1,408
kW-months/year
$4,920
982
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas