Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1987 |
Principal Product | PLYWOOD |
NAICS | n/a |
SIC | 2436 - Softwood Veneer And Plywood |
Sales | $10,000,000-$50,000,000 |
# of Employees | 93 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 128,000 Thousand Feet |
Production Hrs. Annual | 5,808 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $355,950 | 7,910,024 | kWh | $0.04 |
Natural Gas | $162,350 | 38,249 | MMBtu | $4.24 |
Wood | $135,000 | 135,003 | MMBtu | $1.00 |
TOTAL ENERGY COSTS | $653,300 | |||
RECOMMENDED SAVINGS* | $61,693 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,078 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Wood | Administrative Changes | Electricity Usage | Natural Gas | Wood | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,105 Cost: - |
$1,105 | 24,619 | - | - | - | - | - | - |
$1,105 24,619 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $4,491 Cost: $300 |
- | - | $4,611 | 1,085 | - | - | $(-120) | - |
- - kWh |
$4,611 1,085 MMBtu |
- - MMBtu |
$(-120) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $658 Cost: $50 |
$658 | 14,654 | - | - | - | - | - | - |
$658 14,654 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT |
Savings: $49,615 Cost: $15,000 |
- | - | $53,975 | 12,700 | $(-4,360) | (-12,700) | - | - |
- - kWh |
$53,975 12,700 MMBtu |
$(-4,360) (-12,700) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,718 Cost: $2,032 |
$1,608 | 35,756 | - | - | - | - | $110 | - |
$1,608 35,756 kWh |
- - MMBtu |
- - MMBtu |
$110 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,250 Cost: $1,844 |
$1,250 | 27,843 | - | - | - | - | - | - |
$1,250 27,843 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $2,856 Cost: $3,960 |
$2,856 | - | - | - | - | - | - | - |
$2,856 - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,693 Cost: $23,186 |
$7,477 | 102,872 | $58,586 | 13,785 | $(-4,360) | (-12,700) | $(-10) | - | $7,477 102,872 kWh |
$58,586 13,785 MMBtu |
$(-4,360) (-12,700) MMBtu |
$(-10) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,078 Cost: $8,186 |
$7,477 | 102,872 | $4,611 | 1,085 | - | - | $(-10) | - | $7,477 102,872 kWh |
$4,611 1,085 MMBtu |
- - MMBtu |
$(-10) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Wood | Administrative Changes | Electricity Usage | Natural Gas | Wood | Administrative Changes |