IAC Assessment: OR0002
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0002
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1987
Principal Product LEAD ACID BATTERIES
NAICS n/a
SIC 3691 - Storage Batteries
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 0
Annual Production 297,360 Pieces
Production Hrs. Annual 5,808
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,237 4,216,002 kWh $0.03
Natural Gas $45,626 9,728 MMBtu $4.69
TOTAL ENERGY COSTS $176,863
RECOMMENDED SAVINGS* $16,908 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,695
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,190
Cost:
$300
- - $2,190 466 - - -
-
kWh
$2,190
466
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,568
Cost:
$550
$4,568 - - - - - $4,568
-
kWh
-
-
MMBtu
-
-
$
03: 3.4151 MINIMIZE WATER USAGE Savings:
$1,082
Cost:
$300
- - $761 162 $321 - -
-
kWh
$761
162
MMBtu
$321
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,563
Cost:
$4,730
- - $3,563 758 - - -
-
kWh
$3,563
758
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,962
Cost:
$7,398
$4,962 - - - - - $4,962
-
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$543
Cost:
$970
$608 19,637 - - $(-65) - $608
19,637
kWh
-
-
MMBtu
$(-65)
-
$
TOTAL RECOMMENDED Savings:
$16,908
Cost:
$14,248
$10,138 19,637 $6,514 1,386 $256 - $10,138
19,637
kWh
$6,514
1,386
MMBtu
$256
-
$
TOTAL IMPLEMENTED Savings:
$7,695
Cost:
$8,668
$5,570 19,637 $2,190 466 $(-65) - $5,570
19,637
kWh
$2,190
466
MMBtu
$(-65)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes