Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1987 |
Principal Product | LUMBER |
NAICS | n/a |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $10,000,000-$50,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 1,320,000 Thousand Feet |
Production Hrs. Annual | 4,576 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $330,922 | 6,961,899 | kWh | $0.05 |
Fuel Oil #2 | $293,072 | 73,920 | MMBtu | $3.96 |
Wood | $207,914 | 358,474 | MMBtu | $0.58 |
TOTAL ENERGY COSTS | $831,908 | |||
RECOMMENDED SAVINGS* | $410,617 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $408,805 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Wood | Administrative Changes | Electricity Usage | Fuel Oil #2 | Wood | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $33,410 Cost: $300 |
- | - | $19,377 | 4,888 | $14,033 | 23,866 | - | - |
- - kWh |
$19,377 4,888 MMBtu |
$14,033 23,866 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,812 Cost: - |
$1,812 | 38,101 | - | - | - | - | - | - |
$1,812 38,101 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $31,778 Cost: $2,900 |
- | - | $18,529 | 4,679 | $13,249 | 22,843 | - | - |
- - kWh |
$18,529 4,679 MMBtu |
$13,249 22,843 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $28,881 Cost: $11,000 |
$28,881 | - | - | - | - | - | - | - |
$28,881 - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $269 Cost: $261 |
$269 | 5,569 | - | - | - | - | - | - |
$269 5,569 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,307 Cost: $36,869 |
$12,307 | 473,329 | - | - | - | - | - | - |
$12,307 473,329 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
Savings: $302,160 Cost: $3,750,000 |
$306,321 | 6,444,900 | - | - | $(-54,280) | (-92,000) | $50,119 | - |
$306,321 6,444,900 kWh |
- - MMBtu |
$(-54,280) (-92,000) MMBtu |
$50,119 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $410,617 Cost: $3,801,330 |
$349,590 | 6,961,899 | $37,906 | 9,567 | $(-26,998) | (-45,291) | $50,119 | - | $349,590 6,961,899 kWh |
$37,906 9,567 MMBtu |
$(-26,998) (-45,291) MMBtu |
$50,119 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $408,805 Cost: $3,801,330 |
$347,778 | 6,923,798 | $37,906 | 9,567 | $(-26,998) | (-45,291) | $50,119 | - | $347,778 6,923,798 kWh |
$37,906 9,567 MMBtu |
$(-26,998) (-45,291) MMBtu |
$50,119 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Wood | Administrative Changes | Electricity Usage | Fuel Oil #2 | Wood | Administrative Changes |