IAC logo
IAC Assessment: OR0015
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0015
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1987
Principal Product PACKAGED SEAFOOD
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 12,300,000 Pounds
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,104 1,505,862 kWh $0.05
Natural Gas $28,733 5,974 MMBtu $4.81
TOTAL ENERGY COSTS $104,837
RECOMMENDED SAVINGS* $18,190 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,286
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$8,494
Cost:
-
$8,494 169,695 - - - - $8,494
169,695
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$389
Cost:
-
$389 7,913 - - - - $389
7,913
kWh
-
-
MMBtu
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$376
Cost:
-
$269 5,275 - - $107 - $269
5,275
kWh
-
-
MMBtu
$107
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$553
Cost:
$300
- - $553 115 - - -
-
kWh
$553
115
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$481
Cost:
$411
$529 10,551 - - $(-48) - $529
10,551
kWh
-
-
MMBtu
$(-48)
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$115
Cost:
$108
$115 2,345 - - - - $115
2,345
kWh
-
-
MMBtu
-
-
$
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,872
Cost:
$3,935
$2,872 - - - - - $2,872
-
kWh
-
-
MMBtu
-
-
$
09: 3.4151 MINIMIZE WATER USAGE Savings:
$4,910
Cost:
$9,364
$4,910 46,307 - - - - $4,910
46,307
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,190
Cost:
$14,118
$17,578 242,086 $553 115 $59 - $17,578
242,086
kWh
$553
115
MMBtu
$59
-
$
TOTAL IMPLEMENTED Savings:
$5,286
Cost:
$9,364
$5,179 51,582 - - $107 - $5,179
51,582
kWh
-
-
MMBtu
$107
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes