IAC logo
IAC Assessment: OR0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product POWER CONVERSION PROD.
NAICS n/a
SIC 3612 - Transformers, Except Electronic
Sales $10,000,000-$50,000,000
# of Employees 850
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 0
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $314,855 5,922,626 kWh $0.05
Natural Gas $8,111 1,404 MMBtu $5.78
TOTAL ENERGY COSTS $322,966
RECOMMENDED SAVINGS* $37,394 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,713
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$2,713
Cost:
$200
$2,713 51,290 - - - - $2,713
51,290
kWh
-
-
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$10,457
Cost:
$5,000
$7,057 133,060 $3,400 606 - - $7,057
133,060
kWh
$3,400
606
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$572
Cost:
$502
$548 10,258 - - $24 - $548
10,258
kWh
-
-
MMBtu
$24
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,545
Cost:
$37,827
$18,949 357,562 - - $3,596 - $18,949
357,562
kWh
-
-
MMBtu
$3,596
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,107
Cost:
$2,023
$1,170 21,981 - - $(-63) - $1,170
21,981
kWh
-
-
MMBtu
$(-63)
-
$
TOTAL RECOMMENDED Savings:
$37,394
Cost:
$45,552
$30,437 574,151 $3,400 606 $3,557 - $30,437
574,151
kWh
$3,400
606
MMBtu
$3,557
-
$
TOTAL IMPLEMENTED Savings:
$2,713
Cost:
$200
$2,713 51,290 - - - - $2,713
51,290
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes