IAC logo
IAC Assessment: OR0027
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0027
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product TELEPHONE DIRECTORIES
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $50,000,000-$100,000,000
# of Employees 203
Plant Area (Sq.Ft.) 0
Annual Production 70,000 Tons
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $287,207 5,322,099 kWh $0.05
Natural Gas $32,263 6,875 MMBtu $4.69
TOTAL ENERGY COSTS $319,470
RECOMMENDED SAVINGS* $12,432 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,499
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$604
Cost:
-
$604 11,137 - - - - $604
11,137
kWh
-
-
MMBtu
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,024
Cost:
-
$2,024 37,515 - - - - $2,024
37,515
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,286
Cost:
$749
$3,362 62,427 - - $(-76) - $3,362
62,427
kWh
-
-
MMBtu
$(-76)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$623
Cost:
$623
$704 12,896 - - $(-81) - $704
12,896
kWh
-
-
MMBtu
$(-81)
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$342
Cost:
$396
$342 6,448 - - - - $342
6,448
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$545
Cost:
$689
$448 8,206 - - $97 - $448
8,206
kWh
-
-
MMBtu
$97
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$201
Cost:
$260
$201 3,810 - - - - $201
3,810
kWh
-
-
MMBtu
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,092
Cost:
$2,730
$1,092 - - - - - $1,092
-
kWh
-
-
MMBtu
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,684
Cost:
$7,740
- - $3,684 808 - - -
-
kWh
$3,684
808
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31
Cost:
$135
$31 586 - - - - $31
586
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,432
Cost:
$13,322
$8,808 143,025 $3,684 808 $(-60) - $8,808
143,025
kWh
$3,684
808
MMBtu
$(-60)
-
$
TOTAL IMPLEMENTED Savings:
$6,499
Cost:
$11,950
$2,718 30,187 $3,684 808 $97 - $2,718
30,187
kWh
$3,684
808
MMBtu
$97
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes