IAC logo
IAC Assessment: OR0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product PACKAGED SEAFOOD
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 0
Annual Production 29,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $181,760 4,177,902 kWh $0.04
Natural Gas $97,865 20,844 MMBtu $4.70
TOTAL ENERGY COSTS $279,625
RECOMMENDED SAVINGS* $9,966 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,625
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$767
Cost:
-
$767 17,585 - - - - $767
17,585
kWh
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,744
Cost:
$300
- - $3,744 823 - - -
-
kWh
$3,744
823
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$279
Cost:
$167
$279 6,448 - - - - $279
6,448
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$575
Cost:
$878
$417 9,379 - - $158 - $417
9,379
kWh
-
-
MMBtu
$158
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$260
Cost:
$295
$304 7,034 - - $(-44) - $304
7,034
kWh
-
-
MMBtu
$(-44)
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,051
Cost:
$4,500
$2,051 - - - - - $2,051
-
kWh
-
-
MMBtu
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,290
Cost:
$7,790
- - $2,290 503 - - -
-
kWh
$2,290
503
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,966
Cost:
$13,930
$3,818 40,446 $6,034 1,326 $114 - $3,818
40,446
kWh
$6,034
1,326
MMBtu
$114
-
$
TOTAL IMPLEMENTED Savings:
$5,625
Cost:
$1,640
$1,767 40,446 $3,744 823 $114 - $1,767
40,446
kWh
$3,744
823
MMBtu
$114
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes