IAC logo
IAC Assessment: OR0035
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0035
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product CANNED DOG & CAT FOOD
NAICS n/a
SIC 2047 - Dog And Cat Food
Sales $10,000,000-$50,000,000
# of Employees 116
Plant Area (Sq.Ft.) 0
Annual Production 99,000,000 Pounds
Production Hrs. Annual 5,616
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,586 2,480,363 kWh $0.05
Natural Gas $366,356 107,673 MMBtu $3.40
TOTAL ENERGY COSTS $487,942
RECOMMENDED SAVINGS* $134,106 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $125,553
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$2,098
Cost:
-
- - $2,098 617 - - -
-
kWh
$2,098
617
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$603
Cost:
-
$603 5,569 - - - - $603
5,569
kWh
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,267
Cost:
$300
- - $3,267 961 - - -
-
kWh
$3,267
961
MMBtu
-
-
$
04: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$459
Cost:
$250
- - $459 135 - - -
-
kWh
$459
135
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$944
Cost:
$236
$966 19,637 - - $(-22) - $966
19,637
kWh
-
-
MMBtu
$(-22)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$176
Cost:
$67
$195 3,810 - - $(-19) - $195
3,810
kWh
-
-
MMBtu
$(-19)
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$761
Cost:
$521
$840 16,999 - - $(-79) - $840
16,999
kWh
-
-
MMBtu
$(-79)
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$277
Cost:
$248
$277 5,569 - - - - $277
5,569
kWh
-
-
MMBtu
-
-
$
09: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$99,151
Cost:
$100,000
$(-7,796) (-159,144) - - $106,947 - $(-7,796)
(-159,144)
kWh
-
-
MMBtu
$106,947
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$219
Cost:
$172
$252 4,982 - - $(-33) - $252
4,982
kWh
-
-
MMBtu
$(-33)
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$204
Cost:
$345
$159 3,224 - - $45 - $159
3,224
kWh
-
-
MMBtu
$45
-
$
12: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,996
Cost:
$17,765
- - $5,996 1,764 - - -
-
kWh
$5,996
1,764
MMBtu
-
-
$
13: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$19,951
Cost:
$1,500
- - $19,951 5,868 - - -
-
kWh
$19,951
5,868
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$134,106
Cost:
$121,404
$(-4,504) (-99,354) $31,771 9,345 $106,839 - $(-4,504)
(-99,354)
kWh
$31,771
9,345
MMBtu
$106,839
-
$
TOTAL IMPLEMENTED Savings:
$125,553
Cost:
$103,389
$(-4,504) (-99,354) $23,218 6,829 $106,839 - $(-4,504)
(-99,354)
kWh
$23,218
6,829
MMBtu
$106,839
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes