IAC Assessment: OR0036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product DAIRY PRODUCTS
NAICS n/a
SIC 2026 - Fluid Milk
Sales n/a
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 11,300 Thousand Gallons
Production Hrs. Annual 4,992
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $226,701 4,733,880 kWh $0.05
Natural Gas $73,912 31,097 MMBtu $2.38
TOTAL ENERGY COSTS $300,613
RECOMMENDED SAVINGS* $4,359 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,313
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$752
Cost:
-
$752 15,533 - - - - $752
15,533
kWh
-
-
MMBtu
-
-
$
02: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$523
Cost:
-
- - $523 220 - - -
-
kWh
$523
220
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$855
Cost:
-
$617 12,896 - - $238 - $617
12,896
kWh
-
-
MMBtu
$238
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,523
Cost:
$300
- - $1,523 640 - - -
-
kWh
$1,523
640
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$523
Cost:
$200
- - $523 220 - - -
-
kWh
$523
220
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$129
Cost:
$100
$129 2,638 - - - - $129
2,638
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$54
Cost:
$89
$42 879 - - $12 - $42
879
kWh
-
-
MMBtu
$12
-
$
TOTAL RECOMMENDED Savings:
$4,359
Cost:
$689
$1,540 31,946 $2,569 1,080 $250 - $1,540
31,946
kWh
$2,569
1,080
MMBtu
$250
-
$
TOTAL IMPLEMENTED Savings:
$3,313
Cost:
$489
$1,540 31,946 $1,523 640 $250 - $1,540
31,946
kWh
$1,523
640
MMBtu
$250
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes