IAC Assessment: OR0037
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0037
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product STEEL PIPE AND COATING
NAICS n/a
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 30,000 Tons
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $273,540 5,070,633 kWh $0.05
Natural Gas $98,315 22,030 MMBtu $4.46
TOTAL ENERGY COSTS $371,855
RECOMMENDED SAVINGS* $65,272 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,450
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,463
Cost:
-
$6,463 - - - $6,463
-
kWh
-
-
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$14,466
Cost:
$300
$14,466 - - - $14,466
-
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,754
Cost:
$500
$2,754 50,996 - - $2,754
50,996
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$37,296
Cost:
$10,000
$37,296 691,383 - - $37,296
691,383
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,893
Cost:
$2,025
- - $1,893 424 -
-
kWh
$1,893
424
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$91
Cost:
$176
$91 1,758 - - $91
1,758
kWh
-
-
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,309
Cost:
$6,000
$2,309 - - - $2,309
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$65,272
Cost:
$19,001
$63,379 744,137 $1,893 424 $63,379
744,137
kWh
$1,893
424
MMBtu
TOTAL IMPLEMENTED Savings:
$42,450
Cost:
$16,676
$42,450 744,137 - - $42,450
744,137
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas