IAC logo
IAC Assessment: OR0044
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0044
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product FROZEN CORN & CARROTS
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 94,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $471,882 13,647,714 kWh $0.03
Natural Gas $214,628 56,367 MMBtu $3.81
TOTAL ENERGY COSTS $686,510
RECOMMENDED SAVINGS* $50,641 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,765
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$11,498
Cost:
-
$11,498 332,649 - - - - $11,498
332,649
kWh
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,775
Cost:
$500
- - $1,775 446 - - -
-
kWh
$1,775
446
MMBtu
-
-
$
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$3,200
Cost:
$1,108
- - $3,200 840 - - -
-
kWh
$3,200
840
MMBtu
-
-
$
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$1,512
Cost:
$676
- - $1,512 397 - - -
-
kWh
$1,512
397
MMBtu
-
-
$
05: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$3,162
Cost:
$2,550
- - $2,918 766 $244 - -
-
kWh
$2,918
766
MMBtu
$244
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$297
Cost:
$250
$297 8,499 - - - - $297
8,499
kWh
-
-
MMBtu
-
-
$
07: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$10,545
Cost:
-
- - $9,731 2,554 $814 - -
-
kWh
$9,731
2,554
MMBtu
$814
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,958
Cost:
$1,911
$618 17,878 - - $1,340 - $618
17,878
kWh
-
-
MMBtu
$1,340
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$280
Cost:
$275
$280 8,206 - - - - $280
8,206
kWh
-
-
MMBtu
-
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,889
Cost:
$19,500
$14,889 - - - - - $14,889
-
kWh
-
-
MMBtu
-
-
$
11: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,525
Cost:
$3,063
- - $1,525 400 - - -
-
kWh
$1,525
400
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$50,641
Cost:
$29,833
$27,582 367,232 $20,661 5,403 $2,398 - $27,582
367,232
kWh
$20,661
5,403
MMBtu
$2,398
-
$
TOTAL IMPLEMENTED Savings:
$21,765
Cost:
$7,508
$12,413 359,026 $8,012 2,083 $1,340 - $12,413
359,026
kWh
$8,012
2,083
MMBtu
$1,340
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes