IAC logo
IAC Assessment: OR0045
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0045
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1988
Principal Product FABRICATED LAMB
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 0
Annual Production 12,200,000 Pounds
Production Hrs. Annual 8,736
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,992 1,653,576 kWh $0.04
LPG $41,930 11,799 MMBtu $3.55
TOTAL ENERGY COSTS $100,922
RECOMMENDED SAVINGS* $13,188 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,758
#|Description Savings
Cost
Status Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$1,601
Cost:
$320
- - $1,601 460 - - -
-
kWh
$1,601
460
MMBtu
-
-
$
02: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$614
Cost:
$513
- - $614 176 - - -
-
kWh
$614
176
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$61
Cost:
$64
$61 1,758 - - - - $61
1,758
kWh
-
-
MMBtu
-
-
$
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$3,612
Cost:
$5,792
- - $3,612 1,038 - - -
-
kWh
$3,612
1,038
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,758
Cost:
$8,921
$2,691 74,736 - - $3,067 - $2,691
74,736
kWh
-
-
MMBtu
$3,067
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,542
Cost:
$3,258
- - $1,542 443 - - -
-
kWh
$1,542
443
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,188
Cost:
$18,868
$2,752 76,494 $7,369 2,117 $3,067 - $2,752
76,494
kWh
$7,369
2,117
MMBtu
$3,067
-
$
TOTAL IMPLEMENTED Savings:
$5,758
Cost:
$8,921
$2,691 74,736 - - $3,067 - $2,691
74,736
kWh
-
-
MMBtu
$3,067
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes