IAC Assessment: OR0057
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0057
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product RESINS
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 66
Plant Area (Sq.Ft.) 0
Annual Production 358,000 Pounds
Production Hrs. Annual 8,640
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $252,809 10,257,913 kWh $0.02
Natural Gas $256,703 67,429 MMBtu $3.81
TOTAL ENERGY COSTS $509,512
RECOMMENDED SAVINGS* $19,340 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,990
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$2,420
Cost:
$870
- - $2,252 591 $168 - -
-
kWh
$2,252
591
MMBtu
$168
-
$
02: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$201
Cost:
$145
- - $201 53 - - -
-
kWh
$201
53
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,061
Cost:
$5,850
$6,061 - - - - - $6,061
-
kWh
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$308
Cost:
$389
$308 12,309 - - - - $308
12,309
kWh
-
-
MMBtu
-
-
$
05: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$1,219
Cost:
$1,903
- - $1,010 265 $209 - -
-
kWh
$1,010
265
MMBtu
$209
-
$
06: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$6,972
Cost:
$28,690
- - $6,972 1,830 - - -
-
kWh
$6,972
1,830
MMBtu
-
-
$
07: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$2,159
Cost:
$6,871
$(-484) (-19,343) $2,643 694 - - $(-484)
(-19,343)
kWh
$2,643
694
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,340
Cost:
$44,718
$5,885 (-7,034) $13,078 3,433 $377 - $5,885
(-7,034)
kWh
$13,078
3,433
MMBtu
$377
-
$
TOTAL IMPLEMENTED Savings:
$8,990
Cost:
$7,254
$6,369 12,309 $2,453 644 $168 - $6,369
12,309
kWh
$2,453
644
MMBtu
$168
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes