IAC logo
IAC Assessment: OR0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product TITANIUM CASTINGS
NAICS n/a
SIC 3369 - Nonferrous Foundries, Nec
Sales $1,000,000-$5,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 171,169 Pounds
Production Hrs. Annual 4,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,400 2,706,038 kWh $0.05
Natural Gas $32,445 6,470 MMBtu $5.01
TOTAL ENERGY COSTS $163,845
RECOMMENDED SAVINGS* $18,188 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,446
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$8,281
Cost:
-
$8,281 242,673 - - $8,281
242,673
kWh
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,976
Cost:
$200
$2,976 - - - $2,976
-
kWh
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,940
Cost:
$200
$1,940 - - - $1,940
-
kWh
-
-
$
04: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$1,914
Cost:
$200
- - $1,914 - -
-
kWh
$1,914
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$519
Cost:
$250
$519 10,551 - - $519
10,551
kWh
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$283
Cost:
$172
$283 5,862 - - $283
5,862
kWh
-
-
$
07: 2.2514 COVER OPEN TANKS Savings:
$1,428
Cost:
-
$1,428 41,911 - - $1,428
41,911
kWh
-
-
$
08: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$847
Cost:
$1,170
$847 17,292 - - $847
17,292
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$18,188
Cost:
$2,192
$16,274 318,289 $1,914 - $16,274
318,289
kWh
$1,914
-
$
TOTAL IMPLEMENTED Savings:
$15,446
Cost:
$1,570
$13,532 301,876 $1,914 - $13,532
301,876
kWh
$1,914
-
$
Savings
Cost
$ kWh $ $