IAC Assessment: OR0059
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0059
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product STUD & DIMENSION LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 0
Annual Production 180,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,015,633 23,231,536 kWh $0.04
Wood $175,200 175,199 MMBtu $1.00
TOTAL ENERGY COSTS $1,190,833
RECOMMENDED SAVINGS* $49,767 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,889
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,485
Cost:
$500
$5,485 125,440 - - $5,485
125,440
kWh
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,970
Cost:
$5,000
$7,970 182,298 - - $7,970
182,298
kWh
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,110
Cost:
$826
$1,110 25,498 - - $1,110
25,498
kWh
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,348
Cost:
$1,893
$1,282 29,015 $1,066 - $1,282
29,015
kWh
$1,066
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,976
Cost:
$16,000
$29,187 667,937 $(-1,211) - $29,187
667,937
kWh
$(-1,211)
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,878
Cost:
$8,830
$4,878 133,939 - - $4,878
133,939
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$49,767
Cost:
$33,049
$49,912 1,164,127 $(-145) - $49,912
1,164,127
kWh
$(-145)
-
$
TOTAL IMPLEMENTED Savings:
$44,889
Cost:
$24,219
$45,034 1,030,188 $(-145) - $45,034
1,030,188
kWh
$(-145)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes