IAC logo
IAC Assessment: OR0065
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0065
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product ROCK CRUSHING EQUIPMENT
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 0
Annual Production 276 Pieces
Production Hrs. Annual 4,556
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,105 2,395,369 kWh $0.05
Natural Gas $38,172 7,033 MMBtu $5.43
TOTAL ENERGY COSTS $164,277
RECOMMENDED SAVINGS* $16,285 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,501
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,924
Cost:
$2,050
- - $5,924 1,091 - - -
-
kWh
$5,924
1,091
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,603
Cost:
$1,075
$2,106 50,703 - - $497 - $2,106
50,703
kWh
-
-
MMBtu
$497
-
$
03: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$338
Cost:
$150
$338 6,448 - - - - $338
6,448
kWh
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$394
Cost:
$279
$394 7,327 - - - - $394
7,327
kWh
-
-
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,181
Cost:
$5,400
$5,181 - - - - - $5,181
-
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,845
Cost:
$2,000
$1,845 34,877 - - - - $1,845
34,877
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$16,285
Cost:
$10,954
$9,864 99,355 $5,924 1,091 $497 - $9,864
99,355
kWh
$5,924
1,091
MMBtu
$497
-
$
TOTAL IMPLEMENTED Savings:
$8,501
Cost:
$4,479
$2,577 48,652 $5,924 1,091 - - $2,577
48,652
kWh
$5,924
1,091
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes