IAC logo
IAC Assessment: OR0066
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0066
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product HARDBOARD
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 76,658 Thousand Feet
Production Hrs. Annual 7,488
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $858,680 19,913,248 kWh $0.04
Other Energy $557,126 526,001 MMBtu $1.06
TOTAL ENERGY COSTS $1,415,806
RECOMMENDED SAVINGS* $39,449 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,062
#|Description Savings
Cost
Status Electricity Usage Other Energy Administrative Changes Electricity Usage Other Energy Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$2,525
Cost:
$110
$2,061 48,066 - - $464 - $2,061
48,066
kWh
-
-
MMBtu
$464
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,778
Cost:
$600
$1,778 41,325 - - - - $1,778
41,325
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,545
Cost:
$1,252
$2,545 58,910 - - - - $2,545
58,910
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,387
Cost:
$2,392
$1,498 34,877 - - $889 - $1,498
34,877
kWh
-
-
MMBtu
$889
-
$
05: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$3,480
Cost:
$4,912
- - $3,480 3,295 - - -
-
kWh
$3,480
3,295
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,103
Cost:
$36,047
$25,539 593,787 - - $564 - $25,539
593,787
kWh
-
-
MMBtu
$564
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$631
Cost:
$983
- - $631 595 - - -
-
kWh
$631
595
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$39,449
Cost:
$46,296
$33,421 776,965 $4,111 3,890 $1,917 - $33,421
776,965
kWh
$4,111
3,890
MMBtu
$1,917
-
$
TOTAL IMPLEMENTED Savings:
$37,062
Cost:
$43,904
$31,923 742,088 $4,111 3,890 $1,028 - $31,923
742,088
kWh
$4,111
3,890
MMBtu
$1,028
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Other Energy Administrative Changes Electricity Usage Other Energy Administrative Changes