Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1989 |
Principal Product | WOOLEN TEXTILES |
NAICS | n/a |
SIC | 2231 - Broadwoven Fabric Mills, Wool |
Sales | $50,000,000-$100,000,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 51,840 Thousand Feet |
Production Hrs. Annual | 5,760 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $348,138 | 12,344,080 | kWh | $0.03 |
Natural Gas | $587,111 | 151,304 | MMBtu | $3.88 |
TOTAL ENERGY COSTS | $935,249 | |||
RECOMMENDED SAVINGS* | $40,591 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,808 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $7,313 Cost: - |
- | - | $7,313 | 1,909 | - | - |
- - kWh |
$7,313 1,909 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $2,279 Cost: $385 |
$1,531 | 80,598 | - | - | $748 | - |
$1,531 80,598 kWh |
- - MMBtu |
$748 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $18,329 Cost: $5,500 |
- | - | $18,329 | 4,786 | - | - |
- - kWh |
$18,329 4,786 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $4,079 Cost: $4,000 |
- | - | $3,960 | 1,034 | $119 | - |
- - kWh |
$3,960 1,034 MMBtu |
$119 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,207 Cost: $1,800 |
$1,207 | 43,083 | - | - | - | - |
$1,207 43,083 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,243 Cost: $1,755 |
$1,243 | 43,962 | - | - | - | - |
$1,243 43,962 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $6,141 Cost: $14,400 |
$6,141 | 219,226 | - | - | - | - |
$6,141 219,226 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,591 Cost: $27,840 |
$10,122 | 386,869 | $29,602 | 7,729 | $867 | - | $10,122 386,869 kWh |
$29,602 7,729 MMBtu |
$867 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,808 Cost: $7,940 |
$3,981 | 167,643 | $3,960 | 1,034 | $867 | - | $3,981 167,643 kWh |
$3,960 1,034 MMBtu |
$867 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |