IAC Assessment: OR0069
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product DOOR SASHES
NAICS n/a
SIC 2431 - Millwork
Sales $5,000,000-$10,000,000
# of Employees 56
Plant Area (Sq.Ft.) 0
Annual Production 7,200 Thousand Feet
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,442 3,406,213 kWh $0.05
Fuel Oil #6 $94,398 30,370 MMBtu $3.11
Wood $18,568 38,730 MMBtu $0.48
TOTAL ENERGY COSTS $276,408
RECOMMENDED SAVINGS* $35,162 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,162
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Wood Administrative Changes Electricity Usage Fuel Oil #6 Wood Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,137
Cost:
-
$1,137 30,774 - - - - - - $1,137
30,774
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,222
Cost:
$500
- - $8,224 2,653 $998 2,083 - - -
-
kWh
$8,224
2,653
MMBtu
$998
2,083
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$725
Cost:
$100
$725 19,637 - - - - - - $725
19,637
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$59
Cost:
$45
$59 1,172 - - - - - - $59
1,172
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,854
Cost:
$3,938
$1,909 39,859 - - - - $945 - $1,909
39,859
kWh
-
-
MMBtu
-
-
MMBtu
$945
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$952
Cost:
$300
$952 19,930 - - - - - - $952
19,930
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$108
Cost:
$200
$108 2,345 - - - - - - $108
2,345
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,105
Cost:
$55,093
$20,105 543,962 - - - - - - $20,105
543,962
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$35,162
Cost:
$60,176
$24,995 657,679 $8,224 2,653 $998 2,083 $945 - $24,995
657,679
kWh
$8,224
2,653
MMBtu
$998
2,083
MMBtu
$945
-
$
TOTAL IMPLEMENTED Savings:
$35,162
Cost:
$60,176
$24,995 657,679 $8,224 2,653 $998 2,083 $945 - $24,995
657,679
kWh
$8,224
2,653
MMBtu
$998
2,083
MMBtu
$945
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Fuel Oil #6 Wood Administrative Changes Electricity Usage Fuel Oil #6 Wood Administrative Changes